2012.02.23

Wind Power Potential and Long Term Target along with the Road Map Ver3.2

Wind Power Potential and Long Term Target along with the Road Map Ver3.2

Japan Wind Power Association (JWPA) announced “Wind Power Potential and long term target along with the road map Version 1.1” on 2010.1.15. And it was revised on 2010.6.30 as Version2.1. Now JWPA have released Version 3.2 as below;

1. Long term target
By 2050, weight of wind power energy supply will be more than 10% of the total national demand.
Capacity of the wind power generator in 2050: 50GW
Catch copy: Fifty/Fifty

2. Road map
2020: 11.3GW
2030: 28.8GW
2040: 46.2GW
2050: 50GW

Click the link below for more details
roadmap_v3_2.pdf

SCROLL