{"id":6810,"date":"2023-02-01T05:49:49","date_gmt":"2023-01-31T20:49:49","guid":{"rendered":"https:\/\/jwpa.jp\/cms\/?post_type=information&#038;p=6810"},"modified":"2024-04-25T19:16:10","modified_gmt":"2024-04-25T10:16:10","slug":"2022%e5%b9%b4%e6%9c%ab%e6%97%a5%e6%9c%ac%e3%81%ae%e9%a2%a8%e5%8a%9b%e7%99%ba%e9%9b%bb%e3%81%ae%e7%b4%af%e7%a9%8d%e5%b0%8e%e5%85%a5%e9%87%8f%ef%bc%9a479-5%e4%b8%87kw%e3%80%812622%e5%9f%ba","status":"publish","type":"information","link":"https:\/\/jwpa.jp\/en\/information\/6810\/","title":{"rendered":"Cumulative installed capacity of wind power in 2022:  4,802 MW 2,622 Units"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/InstallationTrend-1.jpg\" alt=\" width=\"1158\" height=\"638\" class=\"alignnone size-full wp-image-6812\" srcset=\"https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/InstallationTrend-1.jpg 1158w, https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/InstallationTrend-1-768x423.jpg 768w\" sizes=\"(max-width: 1158px) 100vw, 1158px\" \/><\/p>\n<table style=\"border-collapse: collapse; width: 100%;\">\n<tbody>\n<tr>\n<td style=\"width: 24.6667%; background-color: #b6cae3;\" rowspan=\"2\">\n<p><span style=\"font-size: 14pt;\"><strong>Result<\/strong><\/span><\/p>\n<p style=\"margin: 0mm; vertical-align: baseline;\"><span lang=\"EN-US\" style=\"font-family: \u6e38\u30b4\u30b7\u30c3\u30af; color: #231815;\">at the end of December,2022<\/span><\/p>\n<\/td>\n<td style=\"width: 75.3333%;\">\n<p>Cumulative installed capacity\u00a0\uff1d4,802MW , <span>2,622Units<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 75.3333%;\">\n<p>New installation in 2022\uff08<span>Gross<\/span>\uff09\uff1d232.9MW,\u3000<span>72Units<\/span><\/p>\n<p>New installation in 2022\uff08Net\uff09\uff1d228.1MW,\u3000<span>65Units<\/span><\/p>\n<p>Decommission\u3000\uff1d4.8MW\u30017Units<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<p>JWPA announced the installed capacity of wind power at the end of December, 2022 on a preliminary basis.<\/p>\n<p>They are surveyed by the JWPA.<\/p>\n<p>&nbsp;<\/p>\n<p>New installation of wind power in 2022 is 1.6 times higher than those of 2021.<\/p>\n<p>Wind farms that have started operation in 2022 become larger in scale, with 6 wind farms over 20 MW.<\/p>\n<p>The average size of new wind farms in 2022 is 29.1 MW\/site, the largest ever. (updated from 27.6 MW\/site in 2020).<\/p>\n<p>The average rating of installed wind turbines exceed 3 MW for the first time, reaching 3.4 MW\/unit.<\/p>\n<p>&nbsp;<\/p>\n<p>The first large-scale commercial offshore wind farm in Japan (Noshiro Port Offshore Wind Farm (84MW)) is a major milestone.<\/p>\n<p>In January, a large onshore wind farm (46.8 MW) started operation in Iwate Prefecture, and the offshore wind farm in Akita City (54.6 MW) is about to start operation.<\/p>\n<p>More new installation is expected in 2023.<\/p>\n<p>&nbsp;<\/p>\n<p>As for offshore wind farm, the cumulative install capacity as of the end of December, 2022 is as follows.<\/p>\n<p>&nbsp;<\/p>\n<p>135 MW, 46 units, 8 sites (including semi-offshore wind farm accessible from coastal areas)<\/p>\n<p>\u00a0 -of which 91.4 MW, 23 units, 4 sites are full-scale offshore wind farms<\/p>\n<p>\u00a0 -of which 5 MW, 2 units, 2 sites are floating type offshore wind farms (Nagasaki Goto 2 MW and Kitakyushu 3 MW)<\/p>\n<p>&nbsp;<\/p>\n<p>As mentioned above, Noshiro Port Offshore Wind Farm, the first commercial full-scale offshore wind farm, started operation at the end of December 2022.<\/p>","protected":false},"featured_media":0,"template":"","information_cat":[79],"class_list":["post-6810","information","type-information","status-publish","hentry","information_cat-jwpa-news","en-US"],"acf":[],"_links":{"self":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information\/6810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information"}],"about":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/types\/information"}],"wp:attachment":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/media?parent=6810"}],"wp:term":[{"taxonomy":"information_cat","embeddable":true,"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information_cat?post=6810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}