{"id":6227,"date":"2022-02-25T06:45:06","date_gmt":"2022-02-24T21:45:06","guid":{"rendered":"https:\/\/jwpa.jp\/cms\/?post_type=information&#038;p=6227"},"modified":"2024-04-25T19:16:09","modified_gmt":"2024-04-25T10:16:09","slug":"2021%e5%b9%b4%e6%9c%ab%e6%97%a5%e6%9c%ac%e3%81%ae%e9%a2%a8%e5%8a%9b%e7%99%ba%e9%9b%bb%e3%81%ae%e7%b4%af%e7%a9%8d%e5%b0%8e%e5%85%a5%e9%87%8f%ef%bc%9a458-1%e4%b8%87kw%e3%80%812574%e5%9f%ba","status":"publish","type":"information","link":"https:\/\/jwpa.jp\/en\/information\/6227\/","title":{"rendered":"Installed capacity of wind power generation at the end of 2021: 4,581 MW,143 MW\/year annually"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/\u56f31en.png\" alt=\" width=\"770\" height=\"423\" class=\"alignnone size-full wp-image-6228\" srcset=\"https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/\u56f31en.png 770w, https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/\u56f31en-768x422.png 768w\" sizes=\"(max-width: 770px) 100vw, 770px\" \/><\/p>\n<p>JWPA announces the installed capacity of wind power generation in Japan as of the end of December 2021.<br \/>They are surveyed by the JWPA.<\/p>\n<p>The cumulative installed capacity at the end of December, 2021 = 4,581 MW, 2,574 units Gross new installation for 2021 (January-December) = 211 MW, 87 units, 16 sites Net new installation for 2021 (January-December) = 143 MW, 23 units Decommission for 2021 (January-December) = 68 MW, 64 units<\/p>\n<p>The annual new installation has decreased from 516 MW in 2021.<br \/>Few large wind farms are start operation in 2021.<br \/>But, about 700MW of projects are under construction and will be start operation in 2022.<\/p>\n<p>As for offshore wind,<br \/>The cumulative installed offshore capacity at the end of December, 2021;<br \/>51.6 MW, 26 units, 6 sites ,including semi-offshore<br \/>7.4 MW, 3 units, 3 sites, excluding semi-offshore<br \/>5 MW, 2 units, 2 sites, floating offshore Net new installation for 2021 (January-December)<br \/>-7 MW, -2 units, 1 sites<br \/>Remained 2MW &amp; 5MW floating turbines at Fukushima was decommissioned in 2021.<br \/>No new offshore wind turbines start operation in Japan 2021.<\/p>\n<p>For Port Associated Area, monopile foundation for Akita(55MW) and<br \/>Noshiro(88MW) port projects were installed in 2021.<br \/>They will start operation in 2022.<\/p>\n<p>For General Common Sea Area auction, the winners were announced for 4 projects in 2021.<br \/>Toda Co. Group:<br \/>- Goto, Nagasaki pref. (floating) : 16.8 MW (Hitachi 2.1MW x 8 units on spar type floater) by Mitsubishi Co, &amp; C Tech (subsidiary company of Chubu Electric Power Co.)<br \/>Group:<br \/>- Noshiro-Mitabe-Oga, Akita pref. (fixed bottom) : 478.8 MW (GE 12.6MW x 38 units. Start operation by Dec.2028)<br \/>- Yurihonjo-North, Akita pref. (fixed bottom) : 819 MW (GE 12.6MW x 65 units. Start operation by Dec.2030)<br \/>- Choshi, Chiba pref. (fixed bottom) : 390.6 MW (GE 12.6MW x 31 units. Start operation by Sep.2028) One more project is in auction process now. Its winner will be announced in 2022.<br \/>- Happou-cho, Akita pref. (fixed bottom) : about 350 MW And, more 17 areas are in the nomination process for auction.<\/p>\n<p>Japanese government has expected 10GW(by approval) \/ 5.7GW(in operation) by 2030.<\/p>","protected":false},"featured_media":0,"template":"","information_cat":[79],"class_list":["post-6227","information","type-information","status-publish","hentry","information_cat-jwpa-news","en-US"],"acf":[],"_links":{"self":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information\/6227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information"}],"about":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/types\/information"}],"wp:attachment":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/media?parent=6227"}],"wp:term":[{"taxonomy":"information_cat","embeddable":true,"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information_cat?post=6227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}