{"id":6133,"date":"2021-02-12T12:00:50","date_gmt":"2021-02-12T03:00:50","guid":{"rendered":"https:\/\/jwpa.jp\/cms\/?post_type=information&#038;p=6133"},"modified":"2024-04-25T19:16:09","modified_gmt":"2024-04-25T10:16:09","slug":"installed-capacity-of-wind-power-generation-at-the-end-of-2020-4439-mw-516-mw-year-annually-updated-on-15-mar","status":"publish","type":"information","link":"https:\/\/jwpa.jp\/en\/information\/6133\/","title":{"rendered":"Installed capacity of wind power generation at the end of 2020: 4,439 MW, 516 MW\/year annually (Updated on 15 Mar.)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/news_image-1.jpg\" alt=\" width=\"895\" height=\"788\" class=\"alignnone size-full wp-image-6132\" srcset=\"https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/news_image-1.jpg 895w, https:\/\/jwpa.jp\/cms\/wp-content\/uploads\/news_image-1-768x676.jpg 768w\" sizes=\"(max-width: 895px) 100vw, 895px\" \/><\/p>\n<p>JWPA announces the installed capacity of wind power generation in Japan as of the end of December 2020.<br \/>They are surveyed by the JWPA.<\/p>\n<p>The cumulative installed capacity at the end of December, 2020<br \/>= 4,439 MW, 2,554 units<br \/>Net new installation for 2020 (January-December)<br \/>= 516 MW, 166 units, 20 sites<\/p>\n<p>The annual new installation has increased about 1.9 times from 270 MW in 2019.<br \/>It is the maximum annual installation in wind power history in Japan.<\/p>\n<p>As for offshore wind, Japanese government has announced new aggressive target,<br \/>10GW by 2030 and 30GW-45GW by 2045, on 15 Dec 2020<br \/>at \"Vision for Offshore Wind Power Industry\uff081st\uff09\".<br \/>The 2nd meeting of the Council for Government-Industry Dialogue for offshore wind<br \/><a href=\"https:\/\/jwpa.jp\/cms\/en\/information\/6130\/\" target=\"_blank\" rel=\"noopener\">https:\/\/jwpa.jp\/page_301_englishsite\/jwpa\/detail_e.html<\/a><\/p>\n<p>The cumulative installed offshore capacity at the end of December, 2020;<br \/>58.6 MW, 28 units, 7 sites ,including semi-offshore<br \/>14.4 MW, 5 units, 4 sites, excluding semi-offshore<br \/>12 MW, 4 units, 3 sites, floating offshore<br \/>Net new installation for 2020 (January-December)<br \/>-7 MW, -1 units, 0 sites<br \/>One 7MW floating turbine at Fukushima was decommissioned in 2020.<br \/>No new offshore wind turbines start operation in Japan 2020.<\/p>\n<p>For Port Associated Area, construction works at Akita(55MW) and Noshiro(88MW) have started.<br \/>They will start operation in 2022.<br \/>\u56fd\u5185\u521d\u306e\u5546\u7528\u6d0b\u4e0a\u98a8\u529b\u767a\u96fb\u4e8b\u696d\u3000\u300c\u79cb\u7530\u6e2f\u30fb\u80fd\u4ee3\u6e2f\u6d0b\u4e0a\u98a8\u529b\u767a\u96fb\u65bd\u8a2d\u5efa\u8a2d\u5de5\u4e8b\u300d\u672c\u683c\u7740\u5de5<br \/>\u3000On 26 March 2020, by Kajima, in Japanese<br \/>\u3000<a href=\"https:\/\/www.kajima.co.jp\/news\/press\/202003\/26c1-j.htm\" target=\"_blank\" rel=\"noopener\">https:\/\/www.kajima.co.jp\/news\/press\/202003\/26c1-j.htm<\/a><\/p>\n<p>For General Common Sea Area, auction has started for;<br \/>- Goto, Nagasaki pref. (floating) : around 20MW<br \/>- Noshiro-Mitabe-Oga, Akita pref. (fixed bottom) : around 350MW<br \/>- Yurihonjo-North, Akita pref. (fixed bottom) : around 350MW<br \/>- Yurihonjo-South, Akita pref. (fixed bottom) : around 350MW<br \/>- Choshi, Chiba pref. (fixed bottom) : around 350MW<br \/>The winners will be announced in 2021.<\/p>\n<p>And, more 10 areas are in the nomination process for auction.<br \/>55 projects of 14.4GW in total are in the Environmental Impact Assessment (EIA) process in Jan.2021.<\/p>","protected":false},"featured_media":0,"template":"","information_cat":[79],"class_list":["post-6133","information","type-information","status-publish","hentry","information_cat-jwpa-news","en-US"],"acf":[],"_links":{"self":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information\/6133","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information"}],"about":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/types\/information"}],"wp:attachment":[{"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/media?parent=6133"}],"wp:term":[{"taxonomy":"information_cat","embeddable":true,"href":"https:\/\/jwpa.jp\/wp-json\/wp\/v2\/information_cat?post=6133"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}